Pilot and mobile installations

The first step towards a sustainable water future. Azulatis' compact and flexible mobile and pilot installations bring the power of water purification to you. Whether it involves testing new technologies, optimizing existing processes, or exploring reuse possibilities, our mobile and pilot installations provide an accurate picture of your water consumption and pave the way for optimized water management.

Request a quote
An employee in a bright orange safety overall, helmet and hearing protection works with a mobile industrial installation. It fills or controls large white barrels with liquids, surrounded by a complex system of pipes, pumps and meters. The installation is located in an open container, with a green outside environment in the background.

Pilot installation

A pilot installation from Azulatis is the ideal way to initiate a large-scale industrial water project. Our test installations are used to investigate on a small scale how the desired process water quality can be achieved from available water sources using innovative techniques.

  • Coagulation : Removes suspended substances and organic contaminants.
  • Ultrafiltration : Removes fine particles and microorganisms.
  • Reverse osmosis Produces high-quality process water with a low salt concentration.

Mobile water factory

A mobile water plant from Azulatis is a compact water treatment system designed to treat surface water, groundwater, or purified wastewater and deliver up to 55 m³/h of purified, potable-quality water, ready for use as industrial service or production water. 

The installation can be deployed on short notice, making it an extremely effective solution for emergencies and temporary needs.

A blue container with the Azulatis logo and the slogan "Unlimited Water Solutions" is in an industrial location. On top of the container there are two white storage tanks with the same logo, supported by green metal frames. The background shows trees and a clear air at dusk.
A technician in an orange safety jacket and a white helmet with hearing protection inspects an open electrical panel full of wiring. He holds a document with technical schemes and studies the installation carefully. The environment contains industrial pipes and equipment.

Studies

In the run-up to the construction of a pilot installation, we delve deep into your company's water processes during a preliminary phase through extensive studies in the following areas:

  • Tackling water -related problems
  • Design of installations
  • Expansion capacity
  • Sustainability
  • Removal of persistent pollutants (Aox, Chloroform, PFAS/PFOS, Micro Plastics, Medicine residues API)

The source of sustainable innovation

Our experienced team is ready to develop a tailor-made solution for your company. From research and design to installation and maintenance, Azulatis guides you through every step of the process. Discover Azulatis' mobile installations and take the first step towards a sustainable water future today.

Contact us
A person in an orange safety jacket fills a small plastic bottle with clear water from an industrial tap. The hand holds the bottle firmly while the water flows. The metal installation has several pipes and taps, with water droplets visible on the surface.

Discover our other solutions

smallogo-blue

Interested in a mobile installation?

Discover our mobile solutions tailored to your company.

Contact us